Skip to content

Passing Time_Interval as a non-2D-vector in the example scripts #1

Description

@sh-cau

In the MATLODE_Example_ERK_ADJ_Integrator script, if you change
Time_Interval = [0 20]
to, e.g.,
Time_Interval = [0 10 20]
an error is thrown. I think this is because of
OPTIONS.Quadrature = Quadrature;
in MATLODE_ERK_ADJ_Integrator in line 171 (and possibly others). There, the function handle is overwritten with the numeric integration value after the first for-loop execution. I am not sure how to fix this appropriately.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions