Skip to content

docs: the SMDC step's part 13 results brought to the merged state through rapid PR 471 (consolidate-1025c) - #472

Merged
rusholme merged 1 commit into
rebuildfrom
consolidate-1025c/1-runbook
Oct 25, 2026
Merged

rusholme merged 1 commit into
rebuildfrom
consolidate-1025c/1-runbook

Conversation

@rusholme

@rusholme rusholme commented Oct 25, 2026 •

Copy link
Copy Markdown
Collaborator

Part 13's results section brought to the merged state through rapid PR 471 (consolidate-1025c task 1). Cut-off: PRs merged before 2026-10-25 04:55:57 UTC; rebuild tip efc03fc6; latest job definition rapid-rebuild:87 = 9f4c54f6 (digest 8ae845df…, read from the job definition at the cut-off).

What and why

docs/foundation-smdc-step.md, ## Results of part 13 so far, its stamp 02:00 UTC, through rapid PR 456 → 04:55 UTC, through rapid PR 471:

  • The opening paragraph: dead-trim's second attempt, the 49 edge and cut rows dispositioned, check_run.sh's FAIL on a run that sent nothing, one stage contract, the science-PSF metric stars; runs 137 and 138 named as failed.
  • One table row per step merged since PR 457, in the table's existing shape: err-edges-ops, err-edges-sci, rts-f213-core (a measurement, not taken), mig-contracts, gate-sci-psf (with PR 465's ring_count regression and fix PR 468), dead-trim (both attempts: run 140 180 packets on an r6i reference, run 141 181 on m6a).
  • The current procedure: check_run.sh's FAIL on no packet set; the job exit codes 64 / 65 / 70 / 75; packet-equality acceptance names the reference's instance type; the foundation verbs only, and never prove on :85 or :86.
  • The live runs (133 to 141) and job definitions (:82 to :87 with shas).
  • What remains: the gate item now holds GBTDS's recorded core and the pending ruling; GBTDS gb3's 1,278 → 1,196 packets, cause unread; RimTimSim F213's science-PSF measurement and next lever; the stage KeyError item removed (fixed by PR 458); the ledger's cut candidates, the remaining uncalled code, the placement dependence; the dated SQL rule now stated in database/README.md.
  • Session notes from PRs 458, 462, 464, 469, 470, 471.

The steps stay where they are; nothing reordered or compacted (mig-runbook follows).

Every merged PR read, and where it landed

PR landed
458, 460 err-edges-ops row; procedure (check_run, exit codes); remains (cut candidates; stage KeyError item removed); session note
459, 461 err-edges-sci row; procedure (65, 70); remains (cut candidates, MAGZP/PSFKIND still 70)
462, 463 rts-f213-core row; remains (RimTimSim); session note
464, 466 mig-contracts row; procedure (verbs, tests.support); remains (dated SQL rule); session note
465, 468, 470 gate-sci-psf row; procedure (:85/:86); remains (gate, gb3 packets, galaxies in the catalog); session notes
467, 469, 471 dead-trim row; procedure (instance type); remains (uncalled db/ids.py, products/ids.py; placement); session notes
rapid_docs 128, 129, 130 named in their rows' where column
rapid_systems none merged

The rapid_docs pages: Caltech-IPAC/rapid_docs#131.

Divergences

  • One table row per step rather than a prose paragraph: the section's twenty-six earlier steps are table rows, and the brief's "one short paragraph per step" reads as that row (implementation choice).

Measurements

None new; every number is from the PRs above. scripts/check-public-safety.sh: clean.

Improvements seen

none

Session notes

PR 457 merged at 02:11:06 UTC, after PR 458 (02:07:23); the brief's search from 02:00:42 caught 458, but a cut-off taken at the consolidate's own merge time would have missed it.

🤖 Generated with Claude Code

Vault edits and left

Written after both merges (state vault f41c081): plans/rapid-foundation.md's Measured section (stamp 04:55 UTC through PR 471), stage table rows and image line (rebuild tip 940e29b5, rapid-rebuild:87 = 9f4c54f6, digest 8ae845df7791…, read from the job definition at 05:03 UTC); briefs/COMMON-rapid.md's tip and behaviour list (PRs 458, 459, 464, 465, 467, 468), stamp 05:04 UTC. Left as the brief limits: the plan's Operations facts line "Runbook results, rapid_docs and this plan's Measured current through rapid PR 456" is now stale (through PR 471; this PR, rapid_docs 131) and is the planner's to move.

…ough rapid PR 471 (consolidate-1025c)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@rusholme
rusholme merged commit 940e29b into rebuild Oct 25, 2026
9 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant