You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Follows the audit chantier (#142, merged by PR #163). The Remotion differential was re-scored against the post-chantier code: 1 gap closed, 11 started, 25 open, 6 re-scored, and 3 defects discovered while verifying.
Spring with a pinned duration, and rest-time measurement
High
—
Out of scope
The two remaining Critical gaps — text measurement with auto-fit, and frame-range rendering — are M-effort and deserve their own chantier. The second one alone gates the whole distributed/serverless axis.
Issue #164 (freeze_at reapplied by hand in five render paths) is also out of scope here: its proper fix goes through the "generic time container" gap, scored M.
Verification contract
Same as the previous chantier, which proved its worth:
Mandatory red phase with a numeric failure output for every fix.
Each workstream verified in isolation on its own branch before merging into the chantier.
cargo test --workspace, fmt --check and clippy -D warnings green.
For workstream A specifically, the expected fix is not to add the 17 missing files to the list, but to delete the manual list: that maintenance mode is what produced the defect, and it will reproduce it at the next rule added.
Outcome: delivered by PR #168. One deviation from the contract above: the workstreams were not verified in isolation — the orchestration saturated the machine and the agents stalled, so verification was redone sequentially on the combined tree. Details in the PR.
Delivered by #168, merged into main. All five S-effort workstreams landed.
One deviation from the verification contract, recorded rather than glossed: the workstreams were not verified in isolation on their own branches. Giving each agent its own CARGO_TARGET_DIR multiplied a Skia-dependent build by five, the machine hit a load average of 75, and the agents stalled. Verification was redone sequentially on the combined tree, which surfaced three defects no agent had seen — including a call site left at 9 arguments after a signature grew to 10, meaning the tree did not compile. Details in #168.
Follow-on work: #169 (frame-range rendering) and #170 (text autofit) closed both remaining Critical gaps.
Activity
[-]chantier: écarts Remotion — la vague à effort S[/-][+]chantier: Remotion gaps — the S-effort wave[/+]LeadcodeDev commentedon Aug 11, 2026
Delivered by #168, merged into
main. All five S-effort workstreams landed.One deviation from the verification contract, recorded rather than glossed: the workstreams were not verified in isolation on their own branches. Giving each agent its own
CARGO_TARGET_DIRmultiplied a Skia-dependent build by five, the machine hit a load average of 75, and the agents stalled. Verification was redone sequentially on the combined tree, which surfaced three defects no agent had seen — including a call site left at 9 arguments after a signature grew to 10, meaning the tree did not compile. Details in #168.Follow-on work: #169 (frame-range rendering) and #170 (text autofit) closed both remaining Critical gaps.