Skip to content

chore: llms.txt - add Camel 4.24 (in development), link recent blog posts - #1866

Merged
davsclaus merged 2 commits into
mainfrom
chore/llms-txt-refresh
Nov 21, 2026
Merged

davsclaus merged 2 commits into
mainfrom
chore/llms-txt-refresh

Conversation

@davsclaus

@davsclaus davsclaus commented Nov 19, 2026 •

Copy link
Copy Markdown
Contributor

Refreshes llms-txt-template.md, the source of /llms.txt.

Changes

  • AI integration: the section and the key facts now describe what Camel itself provides, in the route (MCP/A2A, identity, authorization, observability).
  • Wanaku: listed under Tooling, with the text of the tooling page and a link to the Wanaku 0.3.0 post.
  • Java 21: the CLI install line notes that Camel 4.24 requires Java 21.
  • Coming in Camel 4.24 (in development): the manual and next docs are built from main, so readers already land on 4.24 pages. New section covering the faster CLI on aesh with the exit-code contract, Chaos / Test DST / Sanitizer, AI Prompt, Cedar, Semantic OpenAI and Micrometer, new connectors, and the removed OGNL and WASM languages, with a link to the 4.24 upgrade guide.
  • CLI and TUI pages: camel status, Exit Codes and Output, Java API for Export and Run, TUI Ways to Use AI, TUI Screenshots and Demo Recordings; a "Trust the exit code" rule in the guidance for AI models.
  • Tooling: IDE plugins, Maven plugins, hawt.io and Wanaku, matching the tooling page.
  • Team page: add the organisations of two top committers listed in llms.txt (Adriano Machado: Red Hat, Aurélien Pupier: IBM), and reword the llms.txt line that pointed to the team page as the full list of affiliations, since most entries have none.
  • Recent blog posts: testing (CLI test plugin, testing pitfalls), RAG (document ingestion, agentic RAG), 4.23 What's New, the 4.23 security advisories, and the Core CI improvements.

All camel.apache.org/manual and components/next links were checked against the docs in apache/camel main. test/llms-txt-test.js passes.

Merge order

This links /blog/2026/11/camel-cli-424/, so merge #1859 first.

🤖 Generated with Claude Code

https://claude.ai/code/session_016Y4dDi5iQNgtHrDdz2NpwF

@github-actions

Copy link
Copy Markdown
Contributor

🚀 Preview is available at https://pr-1866--camel.netlify.app

davsclaus and others added 2 commits November 21, 2026 13:27
…osts

- The AI integration section and key facts describe the in-route model (MCP/A2A,
  identity, authorization, observability); Wanaku is listed under Tooling, as on
  the tooling page
- Java 21 is the minimum from Camel 4.24
- Add a "Coming in Camel 4.24" section: faster CLI on aesh with an exit-code contract,
  Chaos, Test DST, Sanitizer, AI Prompt, Cedar, Semantic OpenAI/Micrometer, new connectors,
  removed OGNL and WASM languages
- Link new CLI manual pages (exit codes, Java API, TUI ways to use AI, TUI recording)
  and the `camel status` command
- Tooling: IDE plugins, Maven plugins, hawt.io and Wanaku
- Link recent blog posts on testing, RAG, Camel 4.23, security advisories and CI

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_016Y4dDi5iQNgtHrDdz2NpwF
… Pupier; llms.txt - say the team list is self-reported

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@davsclaus davsclaus changed the title chore: llms.txt - remove Wanaku, add Camel 4.24 (in development), link recent blog posts chore: llms.txt - add Camel 4.24 (in development), link recent blog posts Nov 21, 2026
@davsclaus
davsclaus force-pushed the chore/llms-txt-refresh branch from d5e1f52 to fb8968d Compare November 21, 2026 12:28
@github-actions

Copy link
Copy Markdown
Contributor

🚀 Preview is available at https://pr-1866--camel.netlify.app

@davsclaus
davsclaus merged commit 66226a3 into main Nov 21, 2026
3 checks passed
@davsclaus
davsclaus deleted the chore/llms-txt-refresh branch November 21, 2026 13:12
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant