Repository navigation
fix: keep a DPP build side's storage-partitioned join free of exchanges - #7662
Open
snmvaughan wants to merge 4 commits into
Open
snmvaughan wants to merge 4 commits into
snmvaughan wants to merge 4 commits into
GitHub Actions / CI (fork)
failed
Nov 20, 2026 in 1h 8m 24s
Fork CI: failure
CI run on snmvaughan/arrow-datafusion-comet for 6dab540.
Rerun failed checks in the fork. A green fork run tests the branch head, not its merge with main.
This check is informational: the contributor controls the fork workflow. The upstream merge queue runs the required CI checks on the proposed merge result. Active or missing runs on recently updated PRs are polled every 15 minutes; a rotating sweep also discovers reruns on older PRs. Scheduled updates may be delayed.
Details
{"head_sha":"6dab540e2c448d1ee0a1f0e7830bf14a21ec2dc1","run_id":44770927428,"run_attempt":1}
Loading