Skip to content

Update boostraps on master as per B.2.0 of Release plan - #12250

Merged
mergify[bot] merged 1 commit into
haskell:masterfrom
Mikolaj:bootstraps-1.18-on-master
Oct 24, 2026
Merged

mergify[bot] merged 1 commit into
haskell:masterfrom
Mikolaj:bootstraps-1.18-on-master

Conversation

@Mikolaj

@Mikolaj Mikolaj commented Aug 20, 2026 •

Copy link
Copy Markdown
Member

Fixes #12233. To be frank, I'm not sure how the resulting dep bumps help people using or abusing the boostrap files (the intended purpose of the files is porting to new architectures, but some distros apparently build from that, too), but if this is not welcome, let's hope they tell us. In principle, this should work as in previous releases and nobody complained then.

Template B: This PR does not modify behaviour or interface

E.g. the PR only touches documentation or tests, does refactorings, etc.

Include the following checklist in your PR:

  • Patches conform to the coding conventions.
  • Is this a PR that fixes CI? If so, it will need to be backported to older cabal release branches (ask maintainers for directions).

Comment thread bootstrap/linux-9.10.3.json
@zlonast

zlonast commented Sep 29, 2026 •

Copy link
Copy Markdown
Collaborator

It looks like something worth considering are we going to merge this?

@ulysses4ever ulysses4ever left a comment

Copy link
Copy Markdown
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Thank you!

@Mikolaj Mikolaj added the merge me Tell Mergify Bot to merge label Oct 22, 2026
@mergify mergify Bot added ready and waiting Mergify is waiting out the cooldown period merge delay passed Applied (usually by Mergify) when PR approved and received no updates for 2 days queued labels Oct 22, 2026
@mergify

mergify Bot commented Oct 24, 2026 •

Copy link
Copy Markdown
Contributor

Merge Queue Status

  • ✅ Entered queue — 2026-10-24 08:57 UTC · Rule: default · triggered by rule Put pull requests in the rebase+merge queue
  • ✅ Checks passed · on draft merge queue: checking #12250 on master (27e758b) #12483
  • ✅ Merged — 2026-10-24 10:58 UTC · at c433b3028bbf5169f6f032d78483a6e2e62c6222 · merge

This pull request spent 2 hours 1 minute 27 seconds in the queue, including 1 hour 50 minutes 6 seconds running CI.

Required conditions to merge
  • #review-threads-unresolved = 0 [🛡 GitHub branch protection]
  • github-review-approved [🛡 GitHub branch protection]
  • any of [🛡 GitHub branch protection]:
    • check-success = Doctest Cabal
    • check-neutral = Doctest Cabal
    • check-skipped = Doctest Cabal
  • any of [🛡 GitHub branch protection]:
    • check-success = Meta checks
    • check-neutral = Meta checks
    • check-skipped = Meta checks
  • any of [🛡 GitHub branch protection]:
    • check-success = docs/readthedocs.org:cabal
    • check-neutral = docs/readthedocs.org:cabal
    • check-skipped = docs/readthedocs.org:cabal
  • any of [🛡 GitHub branch protection]:
    • check-success = Validate post job
    • check-neutral = Validate post job
    • check-skipped = Validate post job
  • any of [🛡 GitHub branch protection]:
    • check-success = fourmolu
    • check-neutral = fourmolu
    • check-skipped = fourmolu
  • any of [🛡 GitHub branch protection]:
    • check-success = hlint
    • check-neutral = hlint
    • check-skipped = hlint
  • any of [🛡 GitHub branch protection]:
    • check-success = Bootstrap post job
    • check-neutral = Bootstrap post job
    • check-skipped = Bootstrap post job
  • any of [🛡 GitHub branch protection]:
    • check-success = whitespace
    • check-neutral = whitespace
    • check-skipped = whitespace
  • any of [🛡 GitHub branch protection]:
    • check-success = Check sdist post job
    • check-neutral = Check sdist post job
    • check-skipped = Check sdist post job
  • any of [🛡 GitHub branch protection]:
    • check-success = Changelogs
    • check-neutral = Changelogs
    • check-skipped = Changelogs

@mergify mergify Bot mentioned this pull request Oct 24, 2026
44 of 84 tasks
@mergify
mergify Bot merged commit c433b30 into haskell:master Oct 24, 2026
78 checks passed
@mergify mergify Bot removed the queued label Oct 24, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

cabal-install: bootstrap merge delay passed Applied (usually by Mergify) when PR approved and received no updates for 2 days merge me Tell Mergify Bot to merge ready and waiting Mergify is waiting out the cooldown period release

Projects

None yet

Development

Successfully merging this pull request may close these issues.

update bootstrap scripts for the 3.18.1.0 release

4 participants