Conversation
Exact-head validation passed 5/5: Build ARSAS #2768, IO List Testing #1321, SV evidence #1752, COMTRADE integration #205, and Windows installer #929. Preserve physical FAT field gate in staging before main/public release.
|
Release-candidate provenance update:
Therefore the staging merge introduced no source-content change; it only changed ancestry/provenance. Source head GitHub currently has all five exact staging-commit runs (#2769/#1322/#1753/#206/#930) queued with no failure and no repository job in progress. Do not add duplicate reruns while the runner queue is stalled. For physical FAT functional testing while GitHub queues the provenance-equivalent staging checks, the validated 1.6.36 artifacts from the identical source tree are acceptable as a field-test package, but they do not waive the pending exact staging CI record and do not authorize merge to Validated artifacts from the identical source tree:
Physical field PASS is still mandatory before retargeting this consolidated PR to |
Purpose
Protected staging lane for the Engineering-integrated FAT workstation and ARSAS 1.6.36 public-release candidate. This PR remains Draft until the exact combined candidate passes CI and the physical FAT field gate.
Current combined candidate
1.6.36384e2fe67b871a329b07ce5db2aa2916cca5c054mainbaseline integrated:3ad21a631d09a175a8030a0764fd880d0ee77560compare main...HEAD:behind_by=0v1.6.35remains untouchedProtected architecture
ardirec.exe, Qt runtime, or Process.Start fallbackmainremains protectedPre-merge validation already completed
On source head
4fd863322f0bb247911cd241f71c366c015449d4, immediately before merge into this staging branch:ARSAS-1.6.36-win-x64-installerARSAS-win-x64-portable-single-exeExact staging CI — RUNNING
The merge commit itself is being requalified now:
Do not treat the pre-merge green run as a substitute for these exact staging-head checks.
Remaining gate — PHYSICAL FAT FIELD
After all five staging checks are green, test the exact artifact produced from staging head
384e2fe67b871a329b07ce5db2aa2916cca5c054on the real IED/SCL workflow:scl-manual-*shadow case while a genuinely ambiguous duplicate still fails closedOnly after this exact physical field candidate passes should the FAT stack be collapsed/merged to
main; the1.6.36release manifest onmainwill then trigger the release pipeline that rebuilds/tests packages, produces checksums/SBOM/provenance/attestations, and publishes the public stable release.